PROJECT OIL & GAS
Our dedicated oil and gas organization has proven know – how and experience in providing various construction solutions with reliable Health, Safety and Environmental systems and backed up by a comprehensive service portfolio.  

 

Project Name:Kota Batak Water Flood Area – 3
Year of Completion:2001 – 2002
Owner:PT. Caltex Pasific Indonesia
Location:Kota Batak Riau – Pekanbaru

Project Description :

Engineering Procurement, Supply & Construction for Civil, Mechanical & Piping, Electrical & Instrument works, start up & Commissioning & operation training on Plot facility of Kotabatak water flood Area 3 to handle 146,000 BFPD. Separation of produced fluid from Gas in Gas boat. Utilization of Gas blanket to be burned at flare stack oil. Oil stabilizer in shipping tank to be transported for  further treatment to meet injection water quality.


 Project Name:Acrylamide Plant of MEC Project
Year of Completion:1997
Owner:Mitsui Toatsu Plant Services Inc.
Location:Merak, West Java

Project Description   :

Project Management which includes Detail Design & Engineering, Procurement, All field Construction work, Field Inspection and Test and Pre-commissioning 


 Project Name:Gas Production and Transportations Facilities, Pantai Pakam Timur
Year of Completion:1996
Owner:Pertamina
Location:Hamparan Perak – North Sumatera

Project Description   :

Engineering Procurement for imported materials and equipment, Basic & detail Design Engineering, Construction for civil work and installation of all facilities, Piping, Electrical & Instrument, Hydrostatic and Inspection Test to Commissioning and Operation Training


 Project Name:BPP I – Upgrading Project
Year of Completion:1995 – 1997
Owner:Pertamina
Location:Balikpapan – East Kalimantan

Project Description   :

Fabrication & Installation, Tie-in Work; Hydrotest & Commissioning for upgrading the capacity of Crude Distillation Unit from 35,000 BPSD to 65,000 BPSD.


 Project Name:PTA I – 2Project
Year of Completion:1995 – 1996
Owner:PT. Bakrie Kasei Corp.
Location:Merak, Cilegon, West Java

Project Description   :

Engineering construction for detail design, prefabrication & installation, radiographic test & inspection, hydrostatic test & pneumatic test, and pre-commissioning Work Volume: C/S, S/S ( SUS 304, 316 L, 317 L), Titanium & Hostelloy, Steel Structure Pipe dia. up to 56" ; Welding joints 281,500 ID ; Total pipe weight = 1,200 tons 


 Project Name:Paiton Private Power Phase I Pre NTP Civil Works
Year of Completion:1995
Owner:PT Paiton Energy Company
Location:Paiton – East Java

Project Description :

Overall site preparation, Blasting & Excavation, Reclamation and Test Embankment


 Project Name:Export Oriented Refinery 1 (Exor-1) Project
Year of Completion:1991 – 1994
Owner:PERTAMINA
Location:Balongan-Indramayu, west Java

Project Description :

Engineering construction covering prefabrication, aboveground installation, underground installation, support, heat tracing, post heat treatment, radiographic inspection, pressure test, flushing, drying, plant test and commissioning, equipment installation for utility area and painting work. Work Volume: C/S, S/S, Alloy & Alky Pipe, Steel Structure & Pipe Support Pipe dia. up to 60". Welding joints 1,232,804 ID; Total pipe weight 14,634 tons; Pipe support 1,107 tons.

 


 

 
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow